G4 Civils and SSIS offered a turnkey solution meeting stringent safety requirements while saving significant construction costs and time on the Rasimone Mine, North Chairlift Shaft Project.  Unique site and project requirements necessitated an innovative construction approach by G4 Civils who approached SSIS for a value-engineered solution using a Multi•Plate system.

With the entire structure pre-assembled in six meter sections next to the decline, G4 Civils planned to lift each section on to the concrete footings and sliding it down to make space for the next section. CJH Cranes was subcontracted by G4 Civils to rig, lift and slide each section safely and effortlessly in place. Within 3 days the entire 78m long structure was installed in the decline.

  Preassembling the Multi.Plate structure
     
  Preassembled 6m sections ready for installation
     
 

First 18m long section moved into position

     
 

Bolting sections together

     
 

Sliding sections into place

     
 

Completed 78m long chairlift tunnel before backfilling

Project-at-a-glance

Project Location: BRPM, Rasimone Mine, North Chairlift
Location: Rustenburg, North West
Type of Product: Multi•Plate
Dimensions: 3.97 m span x 3.34 m rise
Installation Time (start to finish): 23 working days

 